News

Hybrid power plant to supply the Tasiast gold mine

Hybrid power plant to supply the Tasiast gold mine

Between 2022 and 2024, a comprehensive study was conducted to connect a photovoltaic power plant combined with a battery energy storage system (BESS) to the existing electrical installation of the Tasiast gold mine, which is powered by Diesel thermal power plants. The...

Participation in Data Center Sizing

Participation in Data Center Sizing

With the rise of digital technology and artificial intelligence, the proliferation of data centers has become essential to meet the growing needs for data storage and processing. These infrastructures are highly energy-intensive and use increasingly powerful...

Interview of Alla Eddine, a young engineer recently hired at CAPSIM

Interview of Alla Eddine, a young engineer recently hired at CAPSIM

Hello Alla Eddine, can you introduce yourself and tell us about your background?My name is Alla Eddine CHEBBI, a recent graduate engineer from the University of Grenoble, where I earned my Master's in Electrical Energy Systems Design. What motivated you to join...

Internship offers 2025

Internship offers 2025

You are a 3rd-year engineering student looking for an internship?At CAPSIM, we have an opportunity for you!This year, we are offering five internships subjects.